All NewsNews

Fashola: Second Niger Bridge completed

Minister of Works and Housing, Babatunde Fashola, has confirmed that the construction of the second Niger
bridge has now reached its completion stage.

Fashola stated this at an ongoing press briefing to present the President Muhammadu Buhari
scorecard in Abuja yesterday.

According to Fashola, the bridge will soon be released to the public for use.
The minister noted the only factor delaying the commissioning of the road is the construction of the link road which the recent surge of flooding has impeded.

2022 NSF: Minister excludes certain Para-Sports from festival

He said, “I can confirm that the second Niger bridge itself is finished. People can walk through the bridge now unimpeded. What remains is the four-kilometer link road on the Asaba side.

“Right now, our dredger is in place, we have to rebuild the road by reclaiming sand, and the recent surge of flood has slowed us down. On the Onitsha side, there is a 7-kilometre road that links the bridge and the Onitsha-Owerri interchange.”

Related Articles

Leave a Reply

Back to top button